Up ALMA Image Gallery » FEIC2007 Prev Next

Page | 1 | 2 |

UPS Battery
Air-conditioned air-cooled Fan installation
Air-conditioned construction2
Air-conditioned construction3
Air-conditioned construction4
Air-conditioned construction
Air-conditioned Cooling Water Pipe Installation
Air-conditioned Cooling Water Pipe insulating materials Installed
Air-conditioned Temperature Sensor Installation
Cable track Installation2
Cable track Installation
Ceiling Constructing2
Ceiling Constructing3
Ceiling Constructing
Copper wire connecting for Grounding2
Copper wire connecting for Grounding
Entry Door Construction
Generator Base Construction
Generator Installed
Ground Proved the epoxy of finish_JPG1
Ground Proved the epoxy of finish_JPG
Ground Proved the epoxy of first layer_JPG
Ground Proved the epoxy of Second Layer_JPG1
Ground Proved the epoxy of Second Layer_JPG

Total images: 47 | Last update: 2008/5/16 10:07 AM | © JAlbum & Chameleon | Help